3. Capital maintenance

Capital maintenance spend includes works such as:

  • resurfacing roads and pavements
  • preventative treatments to prolong the life of existing surfaces
  • flood alleviation works
  • replacement / refurbishment of bridges and structures

 

Capital maintenance works completed
Year Carriageway resurfacing (km) Footway resurfacing (km) Flood alleviation works (projects) Structures replaced  / refurbished
2025/26 10.17 3.71 1 0
2024/25 8.45 1.92 1 0
2023/24 12.8 1.81 1 3
2022/23 15.0 1.95 1 4
2021/22 47.12 3.46 0 0
2020/21   2.03 1 1